The new NASH procurement scheme can save you heaps! Go to the Members Area to read the details.
- Home
- Future Proof Your Building
- Latest News
- NASH in New Zealand
- Why Choose Steel?
- Building with Steel
- Building with Steel Framing
- Floor Construction
- Bracing Systems
- Steel Wall Framing Anchoring
- Steel Wall Framing Erection
- Roof Framing
- Roof Battens
- Plumbing
- Wiring
- External Door and Window Frames
- Internal Door Frames
- External Wall Cladding
- Ceilings
- Internal Wall Linings
- Architraves, Skirting's and Mouldings
- Stainless Steel Fasteners
- Building Wraps and Steel Frames
- FAQ's
- Building with Steel Framing
- Find Suppliers
- Publications NEW!
- Join NASH
- Useful Links
- Members' Area
- Upcoming Events
- Contact Us
Wiring
Steel house frames must be permanently earthed in accordance with the requirements of the local electricity authorities. A temporary earth should be established until a permanent earth is installed.
Installation of wiring for electrical services is made quick and easy by the provision of pre-punched service holes which can be plain or flared.
Plain holes, which can be either pre-punched, hand punched or cut out with a hole saw, require grommets to be fitted before wiring is pulled through.
Brackets and service fittings are screwed to the frame with self-drilling screws.