The new NASH procurement scheme can save you heaps! Go to the Members Area to read the details.
- Home
- Future Proof Your Building
- Latest News
- NASH in New Zealand
- Why Choose Steel?
- Building with Steel
- Building with Steel Framing
- Floor Construction
- Bracing Systems
- Steel Wall Framing Anchoring
- Steel Wall Framing Erection
- Roof Framing
- Roof Battens
- Plumbing
- Wiring
- External Door and Window Frames
- Internal Door Frames
- External Wall Cladding
- Ceilings
- Internal Wall Linings
- Architraves, Skirting's and Mouldings
- Stainless Steel Fasteners
- Building Wraps and Steel Frames
- FAQ's
- Building with Steel Framing
- Find Suppliers
- Publications NEW!
- Join NASH
- Useful Links
- Members' Area
- Upcoming Events
- Contact Us
Plumbing
All steel framing systems have pre-punched service holes provided in the wall studs. Most manufactures fit grommets in service holes to protect services.
Gas and water piping is simply passed through the service holes to reach the required outlet locations.
Plastic grommets are snapped into the service holes before piping is installed to support pipework and to prevent unwanted frame contact. Copper piping must be completely isolated from the steel frame.
Extra service holes if required must always be positioned close to the centreline of each stud.
In brick veneer construction, piping may be run in the cavity and fixed to the studs with full saddles and self-drilling screws. If this method is used, care must be taken to ensure the cavity is not breached by the pipework.
Pipe sets for baths, basins, showers, cisterns etc are supported in the normal way on timber or steel nogging.
A neoprene membrane should be placed under each pipe set to isolate it from steel nogging.
To provide support for the lip along the back of the bathtub steel wall studs are usually notched at the required height and reinforced. This work is sometimes done during fabrication of the wall frame.